I love it when vendors call about an “issue” with thedwgs & ask for a meeting. Then come and show me all the other products they sell…
Dec 28th
Full scale mockups are saving the day. 3 made so far, all 3 terribly wrong. Drawings and meetings appear to be somewhat useless.
Dec 17th
Mechanical Consultant asks me to approve drawings that have not been seen or drawn… “Can you approve so we can move forward?” Nope.
Dec 17th
Mentioned in @archforhumanity year end newsletter for a couple clinics we worked in Hyderabad. More coming…
Dec 15th
Site visit to explain drawings to contractor. “Width” and “Heigth” getting confused. Problem solved.
Dec 14th
SITE VISIT TIPS #001: If you plan to wear open sandals, be careful of the rebar lying all over the place. You might cut your foot… ouch.
Dec 10th
New project in Hyderabad: 6 story office bldg - after columns are in place - client decides to make it his private residence.
Dec 9th
No car today so I found myself racing through the streets of Hyderabad on the back of a motorcycle. Exhilrating… and unsafe.
Dec 9th
2 tags
Dec 9th
First coat of paint on the Hotel Clubhouse. Still lots to be done, but the end is in sight. : http://bit.ly/6XxfMa
Dec 7th
Packing for 2 days in Hyderabad - Site visit, Design review, and redesign of Housing project on tap.
Dec 7th
One of those days where nothing went right. Design meeting was a nightmare. Starting over on the 5 acre housing design… Monday.
Dec 4th
2 tags
Dec 3rd
November 2009
37 posts
Contractor seems to be getting back at me by giving my phone number to vendors who sell products we’re not using… thanks.